Bidding Center

Mason Engineering And Construction

All Current Jobs

Job Title Description
RE-BID Lagrange County Region B WWTP Improvements EST1965
Lagrange County Regional Utility District
Contract C - Region B Wastewater Treatment Plant Improvements

Bid Date: Friday, December 20, 2019 at 11am
Pre-Bid Date: Thursday, December 5, 2019 at 1pm

• Construction of a new Electrical/Blower Building, rotary screw positive displacement blowers,
motor control center, and other associated piping and equipment.
• Standby electrical generator replacement
• Construction of a new Storage Building, sludge dewatering room, and sludge dewatering pad.
• Construction of a new Dry Sludge Storage Shelter.
• Various improvements to the existing wastewater treatment plant, including the following:
o Surge tank bypass installation
o Oxidation Ditch upgrades
o Miscellaneous Site Work
Fremont WWTP Project A Town of Fremont, Indiana
Wastewater Treatment Plant and Pump Station Improvements (2019 Re-bid)
Project A: Wastewater Treatment Plant


Bid Date: Tuesday , June 14, 2019
Bid Time: 1pm


Project includes upgrades and improvements at the wastewater treatment facility to maintain sewage treatment capacity, improve maintenance, and replace equipment and structures. Project may include, but not be limited to, the follow major components: Headworks structure improvements; new Bar Screen and Grit Removal Equipment and Building; Headworks Pump Station Improvements and Equipment Replacement, Aeration Tank Blowers, Aerobic Digester Improvements including new blowers, diffusers, piping, and aeration drop pipes, New Sludge Storage & Dewatering Building; Site and Drainage Improvements, and installation of Final Clarifier Covers.
Official Documents