Bidding Center

Mason Engineering And Construction

All Current Jobs

Job Title Description
Fremont Collection System PS Project B (Rebid) Town of Fremont, Indiana Project B Collection System Pump Stations (Rebid)

Bid Date: Friday, October 5, 2018
Bid Time: 1:00PM


Work includes rehabilitation and/or replacement of up to six (6) wastewater collection system pump stations, including replacement of pumps, guide rails, floats and controls, valves, fittings, and hatches; structure lining; related appurtenances; and site restoration.
Fremont WWTP Project A (Rebid) Town of Fremont, Indiana Wastewater Treatment Plant Project A (Rebid)

Bid Date: Friday, October 5, 2018
Bid Time: 1:00PM


Project includes upgrades and improvements at the Wastewater Treatment Facility to maintain sewage treatment capacity, improve maintenance and replace equipment and structures. Project may include, but not be limited to, the following major components: Headworks structure improvements; new Bar Screen and Grit Removal Equipment and Building; Headworks Pump Station Improvements and Equipment Replacement; Aeration Tank Blowers; Aerobic Digester Improvements including new blowers, diffusers, piping, and aeration drop pipes; New Sludge Storage & Dewatering Building; Site and Drainage Improvements; and installation of Final Clarifier Covers.
Warsaw WWTP Expansion - 2017 City of Warsaw, Indiana Wastewater Treatment Plant Expansion - 2017

Bid Date: Thursday, October 11, 2018
Bid Time: 2:00PM

Pre-Bid Date: Wednesday, September 26, 2018
Pre-Bid Time: 10:00AM

The work shall include new grit removal tanks; primary clarifiers and control building; anaerobic selector tank; existing oxidation ditch modifications; final clarifier and sludge pump building; new RAS and WAS pumps; modification of existing final clarifiers; UV disinfection system; anaerobic digesters and control building; modification of existing aerobic digesters to sludge holding tanks; new sludge dewatering equipment, chemical feed building and system; vehicle storage garage; process and yard piping; valves; relocation of the emergency power generator; HVAC; electrical; instrumentation and controls; mechanical; paving; landscaping; and site work necessary for a complete installation, all in accordance with the Contract Documents and Specifications.
Gaston, Indiana Wastewater Utility Imp Town of Gaston, Indiana Wastewater Utility Improvements

Bid Date: Thursday, October 4, 2018
Bid Time: 6:30PM

Pre-Bid Date: Thursday, September 13, 2018
Pre-Bid Time: 10:00AM

The project includes but is not limited to modifications to individual plant processes to improve plant efficiency and effluent quality. The work includes the conversion of the existing dry/wet pit influent lift station to a submersible wet well; the conversion of the tertiary lagoons to an equalization basin; removal of the existing comminutor; improvements to the existing clarifier drive units; expansion of the existing chlorine contact tank; modifications to the plant aeration system; and all other work required to make fully complete and operational, these plant modifications.
Eaton, Indiana WWTP Imp Division A Town of Eaton, Indiana Wastewater Treatment Plant Improvements - Division A
Bid Date: Wednesday, September 26, 2018
Bid Time: 10:00AM

Pre-Bid Date: Thursday, September 6, 2018
Pre-Bid Time: 10:00AM

The project includes but is not limited to general improvements to the Town of Eaton's Wastewater Treatment Plant. The work consists of the installation of variable frequency drives for the raw sewage pumps and existing oxidation ditch rotors, new magnetic flow meter for raw sewage force main, new alum feed system for phosphorus removal, modifications to the chlorination/de-chlorination system for automatic flow pacing, new effluent pump, new emergency generator and switchgear, and new office and lab building and all site piping, electrical, utility, and civil work. All work is to be complete with equipment in place and shall include all other work required for the intended operation.
Cromwell Pump Base Jobsite Pictures
Turkey Creek WWTP Headworks Imp - Contract No. 5 Turkey Creek Regional Sewer District
WWTP Headworks Improvements - Contract No. 5


Bid Date: Thursday, August 16, 2018
Bid Time: 10:00AM

Pre-Bid Date: Thursday, August 2, 2018
Pre-Bid Time: 10:00AM

In general, the work consists of the following improvements, the addition of a sixth raw pump, replace manual bar screen with new Huber Micro Strainer and screen building, add a second 4-ft. dia. vortex grit removal system, and an Alternate Bid to construct a 35-ft. dia. Lakeside final clarifier.
Albany, Indiana Div B - WWTP Imp Town of Albany, Indiana Wastewater System Improvements Division B Wastewater Treatment Plant Improvements

Bid Date: Monday, May 22, 2017
Bid Time: 4:00PM

Pre-Bid Date: Friday, April 28, 2017
Pre-Bid Time: 9:00AM

Project includes but is not limited to expanding the capacity of the Town's existing wastewater treatment facility to 0.8 MGD (average) / 2.0 MGD (peak) by increasing the raw sewage pumping capacity; converting the existing oxidation ditch activated sludge system into an anoxic denitrifying activated sludge system; constructing two new 40' diameter final clarifiers; constructing new new sludge pumping facilities; increasing the capacity of the existing UV disinfection and cascade re-aeration facilities; increasing the side water depth of the existing aerobic digester; and all other ancillary work outlined in the contract documents.
© Mason Engineering & Construction